{}

Nos marques

Bienvenue sur le site Web de Schneider Electric

Bienvenue sur notre site Web.
Consulter notre FAQ
Excitation (aka Wake up or Minimum Pickup) Current for the PM800 Series

The PM800 meets IEC620583 which dictates that the minimum pickup current is 5 mA. There must be a minimum of 5 milliamps current on the CT secondaries (0.1% load with a 5 amp secondary, or 0.5% load with a 1 amp secondary) for the meter to begin metering current.
Key Words:
excitation, pickup, pick up, turn on, PM820, PM850, PM870, PM8

Schneider Electric Belgium