{}

Nos marques

Bienvenue sur le site Web de Schneider Electric

Bienvenue sur notre site Web.

Consulter notre FAQ

What is the operating time of ground fault protection devices defined in the UL 1053 standard?

The UL 1053 standard defines in Table 22.1 the operating time of the ground fault protection devices:
Ground-fault current (A)Time (s)
85% of pickup currentShall not trip
115% of pickup currentUltimately
150% of pickup current2
250% of pickup current1

Schneider Electric Belgium

En savoir plus
Gamme :
Multi93350 PDM - Legacy
En savoir plus
Gamme :
Multi93350 PDM - Legacy