{}

Onze merken

Impact-Company-Logo-English Black-01-177x54

Welkom op de website van Schneider Electric

Welkom op onze website.
Populaire vragen (FAQ's) zoeken
How long is it to install and configure Smartlink ELEC?

Compared to a standard panel and depending on the configuration, additional time is approximately 1 hour to install, wire and set up pulse energy meters.
With Config ELEC app, about 15min are needed to configure the connection between Smartlink EL B and auxiliaries, pulse energy meters and sensors.

Schneider Electric Belgium