{}

Onze merken

Impact-Company-Logo-English Black-01-177x54

Welkom op de website van Schneider Electric

Welkom op onze website.

Populaire vragen (FAQ's) zoeken

What is the method of phase imbalance detection and tripping in TeSys Giga OLR?

Tripping signal shall be sent by phase imbalance protection when detecting imbalance ratio is above 40%. And phase imbalance trip time is 5s(with tolerance ± 20%).
The definitions of phase imbalance ratio and average current according to Annex T T.5.5 IEC60947-1.

Schneider Electric Belgium

Ontdek meer
Productfamilie
Ontdek meer
Productfamilie