Nestlé Nescafé: Customer Story Key Figures
Three stoppages avoided since EcoStruxure implementation
Nestlé engineers received a dozen alerts so far, protecting production
Maintenance moved from annual to biannual schedule, boosting productivity
![Male IT technician in server room](https://www.se.com/ca/en/assets/v2/680/media/419398/900/1285184794-IC-1920x540.jpg)
![Nescafe factory](https://www.se.com/ca/en/assets/v2/680/media/308361/900/_DSC0017-IC-1920x540.jpg)
The Challenge
• Digitalize existing power infrastructure for better operational visibility
• Eliminate power disruptions, which can cost Nestlé $52K hourly
• Ensure electrical equipment operates reliably in harsh conditions
![Coffee and laptop on the table](https://www.se.com/ca/en/assets/v2/680/media/308359/900/_DSC9409-IC-1920x540.jpg)
The Solution
Apps, Analytics & Services: EcoStruxure Asset Advisor
Connected Products: Trihal transformers, QDLogic low-voltage switchboards, LV Prisma Panels, RM6 MV switchboard, Easergy™ sensors
![Electrician repairing the electrical module](https://www.se.com/ca/en/assets/v2/680/media/308360/900/_DSC8828-IC-1920x540.jpg)
The Results
• Remote monitoring allows for predictive maintenance
• Improved visibility into power usage
• Open, interoperable platform enables for future-proof scalability
Learn more
![](https://www.se.com/ca/en/assets/v2/680/media/301063/900/998-21765111_Nestle-CS_DSC0188-IC-1180x590.jpg)
![](https://www.se.com/ca/en/assets/v2/680/media/301064/900/998-21765111_Nestle-CS_DSC7994-IC-1180x590.jpg)
EcoStruxure Power Monitoring Expert
![](https://www.se.com/ca/en/assets/v2/680/media/236323/900/998-21765111_Nestle-CS_DSC8692-IC-980x490.jpg)
EcoStruxure Asset Advisor
![](https://www.se.com/ca/en/assets/v2/680/media/234662/900/998-21765111_Nestle-CS_DSC9526_QA1-IC-980x490.jpg)