As the design and deployment of data center physical infrastructure moves away from art and more toward science, the benefits of a standardized and predictable process are becoming compelling. Beyond the ordering, delivery, and installation of hardware, a
الملفات
اسم الملف | ||
DBOY-6KVM82_R1_EN.pdf
|
|