Contactors fail to pass incoming inspection, contacts do not close.Contactors should be tested under load, not with a digital meter. This is true even for devices that are in service.
See the attached paper.
Released for:Schneider Electric India
Attachment(s)Ohmic verification of power contacts.docx [77.42 KB]