Issue:
Minimum clearances required on the ATS48 soft starters?
Product line:
Altistart 48, ATS48
Environment:
all
Cause:
Mounting inside an enclosure
Resolution:
There is a minimum of 4 inches (100 mm) on the top and bottom of the softstart. A minimum clearance of 2 inches (50mm) on each sides.
The enclosure must also allow for proper ventilation to maintain a maximum temperature of 40C (104F) and provide required wire bending space.
Minimum clearances required on the ATS48 soft starters?
Product line:
Altistart 48, ATS48
Environment:
all
Cause:
Mounting inside an enclosure
Resolution:
There is a minimum of 4 inches (100 mm) on the top and bottom of the softstart. A minimum clearance of 2 inches (50mm) on each sides.