{}

브랜드

Impact-Company-Logo-English Black-01-177x54

슈나이더 일렉트릭 코리아 웹사이트에 방문해 주셔서 감사합니다.

슈나이더 일렉트릭 코리아 웹사이트 방문자 분들 모두 환영합니다.
FAQ 검색
What is the pre-installation procedure for revenue meter PM8000 ?
Issue:
End user needs to revenue lock an PM8000 series meter and needs to what prerequisites are required to place the meter in the revenue lock state

Product:
PM8000 Series Meter

Environment:
Power Metering

Resolution:
You must configure and revenue lock your meter before installation.

• Clear all meter data prior to installing your revenue meter.
• Unlock your revenue meter.
• Configure the required revenue settings specific for installation. Once the meter
is locked, these settings cannot be changed.

• Verify the revenue settings have been implemented.
• Revenue lock your meter.
• Verify the meter is revenue-locked.
• Install the meter according to your meter’s install sheet.
• Install the voltage and current terminal covers according to the sealing kit
installation instructions.

For Instructions on how to revenue lock your PM8000 please check out FA317280


슈나이더 일렉트릭 Korea

자세히 알아보기
제품군
유용한 문서
자세히 알아보기
제품군