{}

브랜드

Impact-Company-Logo-English Black-01-177x54

슈나이더 일렉트릭 코리아 웹사이트에 방문해 주셔서 감사합니다.

슈나이더 일렉트릭 코리아 웹사이트 방문자 분들 모두 환영합니다.

FAQ 검색

How to join together 2 Prisma P frameworks?

The Prisma P framework is delivered with the fixing elements necessary to join together two cubicles installed side by side.


It is recommended to choose the installation position of these elements based on the panels' configuration:
1. If horizontal busbars are installed at the top of the panel, then the 2 short screws have to be installed at the top and the 4 longer screws at the middle and bottom.
2. If horizontal busbars are installed at the bottom of the panel, then the 2 short screws have to be installed at the bottom and the 4 longer screws at the middle and top.
3. If horizontal busbars are not installed in the panel, then any of the 2 solutions above may be used.

The above instructions are meant to assure that the combination screws are not interfering with the installation of horizontal busbar supports or other mounting plates.

슈나이더 일렉트릭 Korea

자세히 알아보기
제품군
Prisma P
자세히 알아보기
제품군
Prisma P