{}

브랜드

Impact-Company-Logo-English Black-01-177x54

슈나이더 일렉트릭 코리아 웹사이트에 방문해 주셔서 감사합니다.

슈나이더 일렉트릭 코리아 웹사이트 방문자 분들 모두 환영합니다.
FAQ 검색
Power Monitoring Expert 2020 or Energy Expert v3.0 Integration Utility fails to generate the EBO ‘Workstation Import file'.
Issue
Power Monitoring Expert 2020 or Energy Expert v3.0 Integration Utility fails to generate the EBO ‘Workstation Import file' when selected authentication method as ‘Automatic PME or Windows Authentication’.

Environment
Power Monitoring Expert 2020 or Energy Expert v3.0 Integration Utility


Cause
A bug (# 104855) in the tool has been logged for this issue.


Resolution
Below workaround can be applied to fix the issue.

1> Using ‘Energy Expert v3.0 Integration Tool’ generate the workstation import file by selecting ‘Manual PME Authentication’.


2> Import the workstation import file (generated from first step) in EBO and this will create required configuration related to PME.

3> Now generate PME Web links (for Dashboard/using web tool (Generate Authentication URL) by using URL 'https://<YourServerName>/Web/MUT'(refer below screen-cap for the same).
For more information on ‘Creating Diagrams, Reports, and Dashboards links in Building Operation’ refer document ‘Power Monitoring Expert 2020 System Guide’ page#1676 (https://www.se.com/ww/en/download/document/7EN02-0426/ )

Generate Destination URL:
/Web for the PMEWeb Applications Settings page.
/Dashboard for the PME Dashboards page.
/Reporter for the PME Web Reports page.

4> Copy authentication URL from previous step and replace same in EBO configuration against each tab configurations.
Note: This bug will be fixed in next version of PME/EE.

슈나이더 일렉트릭 Korea

자세히 알아보기
제품군
유용한 문서
자세히 알아보기
제품군