{}

Наши бренды

Impact-Company-Logo-English Black-01-177x54

Добро пожаловать на сайт Schneider Electric

Добро пожаловать на наш сайт.
Поиск часто задаваемых вопросов
Excitation (aka Wake up or Minimum Pickup) Current for the PM800 Series

The PM800 meets IEC620583 which dictates that the minimum pickup current is 5 mA. There must be a minimum of 5 milliamps current on the CT secondaries (0.1% load with a 5 amp secondary, or 0.5% load with a 1 amp secondary) for the meter to begin metering current.
Key Words:
excitation, pickup, pick up, turn on, PM820, PM850, PM870, PM8

Schneider Electric Казахстан