Search FAQs
Do we have a K-factor graph for our Acti9 iC60 MCBs?
Please refer the attached module CA908024E extract where details have been provided for the Acti9 MCBs tripping curves. f
From t=50μs to 10ms (in function of Ipeak/In) for coordination with load inrush currents including LED lamps - see extract below:
The K-factor is just the ratio of Ipeak/In, i,e,, ratio of Inrush current of LED to its nominal current.
From t=50μs to 10ms (in function of Ipeak/In) for coordination with load inrush currents including LED lamps - see extract below:
The K-factor is just the ratio of Ipeak/In, i,e,, ratio of Inrush current of LED to its nominal current.
Released for:Schneider Electric Malaysia
Attachment(s)
Explore more
Range:
Explore more
Range: