{}

Merkene våre

Impact-Company-Logo-English Black-01-177x54

Velkommen til nettstedet til Schneider Electric

Velkommen til nettstedet vårt.
Søk i ofte stilte spørsmål (FAQ)
Video: How do you remove the main control boards front cover on the Altistart ATS48 soft starter?
Issue:
Removing main control front cover on ATS48.

Product Line:
Altistart

Environment:
All

Cause:
Needs to remove the main control board front cover to check the ribbon cables.

Resolution
Remove the 4 screws  on the main control boards front cover.  Lift up the Main control board about 2 inches to disconnect the ribbon cables.

Schneider Electric Norway

Finn ut mer
Rekkevidde:
Artikler som kan være nyttige
Finn ut mer
Rekkevidde: