{}

As nossas marcas

Impact-Company-Logo-English Black-01-177x54

Bem-vindo ao website da Schneider Electric

Bem-vindo ao nosso site.
Pesquisar nas perguntas frequentes (FAQ)
Should the long time rating plug be removed before insulation and dielectric withstand test in MVS Micrologic?
It is not necessary to remove long time rating plug in Micrologic ET2/ETA2/ ET5S/ETA5S/ ET6G/ETA6G before before insulation and dielectric withstand test .
It is absolutely necessary to remove long time rating plug in Micrologic ETV2I/ ETV5S/ ETV6G before insulation and dielectric withstand test

Schneider Electric Portugal

Explorar mais
Produto:
Explorar mais
Produto: