{}

我們的品牌

Impact-Company-Logo-English Black-01-177x54

歡迎造訪施耐德電機全球網站

歡迎訪問我們的網站

搜尋常見問題

Contactors fail to pass incoming inspection, contacts do not close.

Contactors should be tested under load, not with a digital meter. This is true even for devices that are in service.

See the attached paper.

施耐德電機Taiwan

附件

Ohmic verification of power contacts.docxOhmic verification of power contacts.docx [77.42 KB]
探索更多
系列:
探索更多
系列: