{}

Наші бренди

Impact-Company-Logo-English Black-01-177x54

Вітаємо на веб-сайті Schneider Electric

Ласкаво просимо на наш веб-сайт.
Пошук серед найпопулярніших питань
Can you switch between 2 wire control and 3 wire control using a logic input?
Issue:
Change between 2 wire control and 3 wire control with logic input.

Product Line:
Altivar 61, ATV61

Environment:
All models, All serial numbers.

Cause:
none

Resolution:
The drive must be programmed as either 2 wire or 3 wire control.  There is no way to change this without both programming and wiring changes to the drive.

2 wire control - LI1 is run forward.  The default programming is a transition of LI1 from low to high in order to run.  This can be changed to Level switching.  LI1 must stay closed for the drive to run.
3 wire control - LI1 is stop (NC contact) and LI2 is run forward.  A momentary or maintained closure of LI2 causes the drive to run forward.  LI1 (stop) needs to be opened in order to stop the drive.

Schneider Electric Україна

Досліджуйте більше
Серія:
Статті, які можуть бути корисними
Досліджуйте більше
Серія: