{}

Our Brands

Impact-Company-Logo-English Black-01-177x54

Schneider Electric USA Website

Welcome to our website.
How can we help you today?
What is the pre-installation procedure for revenue meter PM8000 ?
Issue:
End user needs to revenue lock an PM8000 series meter and needs to what prerequisites are required to place the meter in the revenue lock state

Product:
PM8000 Series Meter

Environment:
Power Metering

Resolution:
You must configure and revenue lock your meter before installation.

• Clear all meter data prior to installing your revenue meter.
• Unlock your revenue meter.
• Configure the required revenue settings specific for installation. Once the meter
is locked, these settings cannot be changed.

• Verify the revenue settings have been implemented.
• Revenue lock your meter.
• Verify the meter is revenue-locked.
• Install the meter according to your meter’s install sheet.
• Install the voltage and current terminal covers according to the sealing kit
installation instructions.

For Instructions on how to revenue lock your PM8000 please check out FA317280


Schneider Electric USA

Explore more
Range:
Articles that might be helpful Users group

Discuss this topic with experts

Visit our Community for first-hand insights from experts and peers on this topic and more.
Explore more
Range: