Contactors fail to pass incoming inspection, contacts do not close.Contactors should be tested under load, not with a digital meter. This is true even for devices that are in service.
See the attached paper.
Đã phát hành cho:Schneider Electric Việt Nam
Phần đính kèmOhmic verification of power contacts.docx [77.42 KB]